BB20 00062 Residential Building Permit w/ Mechanical/Plumbing
Address:
1049 5TH ST
BREMERTON,  WA  98337
Parcel #: 3718-023-039-0004
Status: Finaled
Submitted: 1/21/2020
Approved: 2/20/2020
Issued: 2/28/2020
Closed:
Expires: 2/8/2021
Inspections:
Required: 14
Complete: 14
Total Fees:
$1,10437
Additional fees may be required
Project: CONVERT UNFINISHED BASEMENT TO DWELLING UNIT

Public Notice
Description Begin Date End Date

Contacts
:
EQUITY TRUST CO
:
EQUITY TRUST CO

Contractors

Details
Gov Permit?: N
Other Zoning: DSAP-MR2
Council District: DISTRICT 3
Census Class: 434/Add or Alter Dwellings (No Increase or Decrease in Units)
Development Code: 060/Residence, Remodel/Addn
Dwelling Units:
Eng'd SW Req'd?:
Non-Eng'd SW Req'd?:

Parcels
Parcel(s) associated with your permit.
Parcel Owner Address
3718-023-039-0004 EQUITY TRUST CO 1047 5TH ST
BREMERTON,  WA 98337

Submittals

ALL submittal documents must be submitted in PDF form.  All other types will not be accepted.

Submittal Required Received Accepted

Approval Steps
Follow your application through the approval process.
Step Status Date
Public Works Approved w/ Conditions 2/5/2020
Administrative Step to Prepare for Issuance Approved 2/20/2020
Building Department Approved 2/20/2020
Planning Department Approved 1/28/2020
Addressing Completed 1/22/2020

Reviews
Start Complete Applicant Response

Fixtures
Fixture Quantity Per Unit Value
R-Sink (Lavatory, Kitchen, Mop or Bar Sink) 2 $7.00 $14.00
R-Clothes Dryer with Exhaust 1 $10.65 $10.65
R-Bath Fan and/or Exhaust Fan 2 $7.25 $14.50
R-Water Heater 1 $10.65 $10.65
R-Clothes Washing Machine 1 $7.00 $7.00
R-Range Hood 1 $10.65 $10.65
Water Pipe Repair and/or Alteration 1 $7.00 $7.00
R-Water Closet and/or Urinal 1 $7.00 $7.00
Drainage Pipe or Vent Pipe Repair or Alteration 3 $7.00 $21.00
R-Dish Washer 1 $7.00 $7.00
R-Tub and/or Shower Unit 1 $7.00 $7.00
Total: $116.45

Valuations
Valuation Quantity Rate Value
Bid Price from Applicant 45000.00 $1.00  / TOTAL $45,000.00
Total: $45,000.00

Fees
Current fees for your permit are an estimate until the application has been submitted. Final amount due will be calculated upon submission of your completed application.
Fee Amount
Mechanical Fixture Fee $60.80
Plan Review Fee $352.95
State Surcharge Residential $6.50
Technology Fee $35.47
Building Permit $543.00
Plumbing Fixture Fee $105.65
Total : $1,104.37

Bonds
Type Number Amount Issued Expires Completed

Inspections

If the inspection you are requesting is not essential, THE REQUEST WILL BE CANCELLED.  The Department of Community Development is operating in compliance with the Governor's order.

Completed On
Plumbing Groundwork 5/13/2020
Mechanical Rough-In 8/10/2020
Plumbing Rough-In 5/13/2020
Gas Piping Pressure Test 5/15/2020
L&I - Electrical Cover Inspection Before Framing (State of Washington) 5/15/2020
Framing Inspection (Mechanical & Plumb Rough-In, Elect Cover Completed) 5/15/2020
Insulation - Wall 5/15/2020
Sheetrock Nailing 6/9/2020
Paved Driveway & parking areas 8/12/2020
Insulation - Ceiling 5/15/2020
L&I - Electrical Final Inspection 8/10/2020
Final Inspection - Building 8/12/2020
Final Inspection - Zoning 8/11/2020
PW - Driveway approach final 8/12/2020

Structures
Structure Use Occupancy Type Square Footage

Conditions
DCD: Validity of permit. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the Washington State Building code or of any other ordinance of the City of Bremerton. Permits presuming to give authority to violate or cancel the provisions of the Washington State Building code or other ordinances of the City of Bremerton shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the building official from requiring the correction of errors in the construction documents and other data. The building official is also authorized to prevent occupancy or use of a structure where in violation of the Washington State Building code or of any other ordinances of the City of Bremerton.
The temporary use of streets or public property for the storage or handling of materials or of equipment required for construction or demolition, and the protection provided to the public shall comply with the provisions of the applicable governing authority, BMC 11.02. (IBC 3308.1)
Construction equipment and materials shall be stored and placed so as not to endanger the public, the workers or adjoining property for the duration of the construction project. (IBC 3301.2)
Construction materials and equipment shall not be placed or stored so as to obstruct access to fire hydrants, standpipes, fire or police alarm boxes, catch basins or manholes, nor shall such material or equipment be located within 20 feet (6096 mm) of a street intersection, or placed so as to obstruct normal observations of traffic signs. (IBC 3308.1.1)
Fire apparatus access roads shall not be obstructed in any manner, including the parking of vehicles. (IFC 503.4)
DCD: Reinspection Fee: All approved plans, the printed building permit, and the permit inspection placard, are required to be on-site for inspection purposes, and work to be inspected shall be complete and ready for inspection. If an inspection is called for and plans are not available on site, or the work is not ready for inspection, approval will not be granted. In addition, a re-inspection fee will be charged and must be collected by the Department of Community Development prior to any further inspections being performed or approvals granted.
DCD: Approved Plans, Engineering, Site Plan, Permit, and Conditions shall remain on site and be available for inspection. Any changes to plans shall be approved before construction is performed. Architect or engineer of record shall approve the change before submitting a revision. A revision is subject to a revision fee and additional fees for plan review and inspections.
Plumbing work shall be performed by a Level 01 Journeyman Plumber licensed in the state of Washington. Residential plumbing work may be performed by a Level 01 or :Level 02 Journeyman Plumber licensed in the state of Washington. Single family residential plumbing work may be performed by the owner.
A separate electrical permit issued through Labor & Industries (L&I) is required for any new, modified, repair, replacement, service, maintenance, or temporary installations. Electrical work is inspected by L&I prior to cover and the framing inspection. Contact L&I at 360-415-4000 or www.lni.wa.gov. (RCW 19.28)
Carbon Monoxide Alarms. For new construction, an approved carbon monoxide alarm listed in compliance with UL 2034 shall be installed outside of each separate sleeping area in the immediate vicinity of the bedroom in dwelling units and on each level of the dwelling. In a building where a tenancy exists, the tenant shall maintain the CO alarm as specified by the manufacturer including replacement of the batteries.
DCD: Gas Piping: Fuel or gas piping shall be inspected after the installation of fuel/gas piping is complete, and before the attachment of fixtures, appliances, or shut-off valves. At the time of inspection the test pressure shall be no less than 10 psi held for no less than 15 minutes. Appliances to be attached to the fuel/gas piping system shall not be used until the final inspection has been performed and approved by a Building Inspector.
Combustion Air: In buildings of unusually tight construction, or within a garage, all fuel-burning appliances, other than cooking appliances and domestic clothes dryers, shall obtain combustion air from outside in accordance with the International Mechanical Code, International Fuel Gas Code and/or the International Residential Code.
DCD: Plan Review Requirements: The attached plan review checklist and identified corrections, along with the Energy Compliance Worksheet (when applicable) are part of the approved plans and must remain attached thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. All proposed changes to "APPROVED" building plans that effect compliance with the City of Bremerton Building and Fire Code as adopted and amended in BMC Title 17 and Title 18, or any other City of Bremerton ordinance or regulation, must be reviewed and approved by the Department of Community Development prior to construction. Failure to comply and/or removal of attached documents will result in failure of required building inspections.
Final Inspection Required: All building permits shall have a final inspection performed and approved by the City of Bremerton Department of Community Development prior to permit expiration. The failure to request a final inspection or failure to obtain final approval prior to expiration may require a reactivation fee, or a new permit application if more than a year has passed with no activity. The permit expires 180 days past the date of inactivity. Required inspections: Any work required to be inspected and that is covered before such inspection may be required to be uncovered so that the inspection may be performed. Examples of inspections to be performed before covering are mechanical rough-in, plumbing rough-in, gas piping, framing, and sheetrock nailing.
Must comply with Title 20 of the Bremerton Municipal Code, the Downtown Subarea Plan (DTSAP), and development regulations of the Multifamily Residential-2 zone (Chapter 6.5 in the DTSAP).
Parking space for the proposed basement unit is to be paved, and installed in the indicated location on the revised (2/21/20) Site Plan Diagram
PW&U Install driveway approach

Required Permits
Type Requirement For Number Status

Notes

Associations